Slope Stabilization
Slope stabilization EDAR Bakio (Bizkaia)
Main contractor: UTE Taludes Bakio (Lurpelan-Tecimasa)
Client and Promoter: Consorcio de Aguas Bilbao-Bizkaia CABB
Date: 2017
While maintaining the exploitation of the EDAR (Sewage Treatment Plant) of Bakio (Bizkaia), a flexible stabilization system was installed in all the slopes using stainless steel mesh and cables with a load capacity up to 20 kN/m² and steel B500S Gewi bar anchors, Nominal Diameter 32mm.