Underground Civil Works

Dehesa del Terzuelo tunnel, high-speed train. Malpartida de Plasencia.

Owner: ADIF

Client: ADIF. Works in UTE

Construction of double track tunnel by drilling and blasting and mechanical means.

Tunnel 1451.42 m long and 138 m² section.
Construction of an emergency shaft 9 m in diameter and 25 m deep.