
Mining
Recovery of Shaft 3 of Sallent mine, Barcelona
Owner: ICL Iberia
Client: ICL Iberia
Recovery and safety improvement in Shaft 3 of Sallent mine, measuring 4.5 metres in diameter and 300 metres in depth. Wall cleaning, cable and pipe replacement, water catchment and entire reconstruction of the loading station.